Project Details
- Posted On: 12 Jun 2013
Here the existing distribution section with new 1200 amp meter and beaker section can be viewed. cei installed these four feeder conduits from the new 1200 amp service section to the transfer switch (at the opposite end of the distribution section).
We installed new secondary conduits from the utility transformer into the new service section. Power was kept on until the change over of power by the utility company. The utility company then removed the old feeder wiring from the transformer and the old meter section. All this was done during a scheduled change over, so the institute was not inconvenienced. The new transfer switch was tested during a simulated power failure. Another successful project on time and within budget.