Our Work

  • cei Electrical Service was retained to install a...

    250_gen_l

    250 KW Generator

    cei Electrical Service was retained to install a new 250 KW generator at the Sun Health Research Institute. This four story research center is located next to Boswell Hospital in Sun City, Arizona.

    View Details
  • Here the existing distribution section with new 1200 amp...

    distribution section

    Distribution Section

    Here the existing distribution section with new 1200 amp meter and beaker section can be viewed. cei installed these four feeder conduits from the new 1200 amp service section to the transfer switch (at the opposite end of the distribution section).

    View Details
  • Here the existing distribution section with new 1200 amp...

    new_trans_l

    New Transfer Switch

    Here the existing distribution section with new 1200 amp meter and beaker section can be viewed. cei installed these four feeder conduits from the new 1200 amp service section to the transfer switch (at the opposite end of the distribution section).

    View Details
  • 1.5 and 2.0 megawatt Caterpillar diesel generators shown with their 2500 amp and 3000 amp main circuit breaker cabinets. This installation was inside Boswell Hospital in Sun City, Arizona

    boswel_l

    Caterpillar Diesel Generators

    1.5 and 2.0 megawatt Caterpillar diesel generators shown with their 2500 amp and 3000 amp main circuit breaker cabinets. This installation was inside Boswell Hospital in Sun City, Arizona

    View Details
  • cei Electrical Service was the electrical contractor on...

    HighlandFire1

    Highland Fire Station

    cei Electrical Service was the electrical contractor on the new construction of Highland Fire Station south of Flagstaff, Arizona. cei also installed a 10 KW solar system on Highland fire station.

    View Details