  • cei Electrical Service was retained to install a new 250 KW generator at the Sun Health Research Institute. This four story research center is located next to Boswell...

    250_gen_l

    250 KW Generator

  • Here the existing distribution section with new 1200 amp meter and beaker section can be viewed. cei installed these four feeder conduits from the new 1200 amp service section...

    distribution section

    Distribution Section

  • Here the existing distribution section with new 1200 amp meter and beaker section can be viewed. cei installed these four feeder conduits from the new 1200 amp service...

    new_trans_l

    New Transfer Switch

  • 1.5 and 2.0 megawatt Caterpillar diesel generators shown with their 2500 amp and 3000 amp main circuit breaker cabinets. This installation was inside Boswell Hospital in Sun City, Arizona

    boswel_l

    Caterpillar Diesel Generators

  • cei Electrical Service was the electrical contractor on the new construction of Highland Fire Station south of Flagstaff, Arizona. cei also installed a 10 KW solar system...

    HighlandFire1

    Highland Fire Station