cei Electrical Service was retained to install a new 250 KW generator at the Sun Health Research Institute. This four story research center is located next to Boswell...
Here the existing distribution section with new 1200 amp meter and beaker section can be viewed. cei installed these four feeder conduits from the new 1200 amp service section...
Here the existing distribution section with new 1200 amp meter and beaker section can be viewed. cei installed these four feeder conduits from the new 1200 amp service...
1.5 and 2.0 megawatt Caterpillar diesel generators shown with their 2500 amp and 3000 amp main circuit breaker cabinets. This installation was inside Boswell Hospital in Sun City, Arizona
cei Electrical Service was the electrical contractor on the new construction of Highland Fire Station south of Flagstaff, Arizona. cei also installed a 10 KW solar system...